Skip to content

cortex: euclid → dormant; re-home phase 4 to euclid_dr1_prelim - #18

Merged
Jammy2211 merged 1 commit into
mainfrom
feature/euclid-dormant-rehome-phase4
Sep 7, 2026
Merged

Jammy2211 merged 1 commit into
mainfrom
feature/euclid-dormant-rehome-phase4

Conversation

@Jammy2211

Copy link
Copy Markdown
Contributor

Three changes, approved by the human on 2026-09-07:

  1. projects.yaml: euclid → status: dormant. Its local output/ was cleared on 2026-09-07 (60 GB of May–June DR1 grade_ab runs, still on RAL under /mnt/ral/jnightin/euclid) and the DR1 prelim science moves to euclid_dr1_prelim. The row, its remaining phases (5, 6, 7) and its rulings all stay; the reason is appended to the row's note:.
  2. Phase 4 re-homed. git mv phases/euclid/dr1_prelim_10_lens_science_run.md phases/euclid_dr1_prelim/dr1_prelim_10_lens_science_run.md; Project: euclid_dr1_prelim and the H1 follow the directory (# Euclid_dr1_prelim — phase 4: …, the project convention), Phase: 4 is kept because the Mind epic euclid-dr1-prep names it phase 4, and a ## Where to look bullet records the re-home. Witness, Gates, State, Budget, Runs and Ruling are untouched. phases/euclid/resimulate_fitted_lens_simulator.md now links the new path.
  3. euclid_dr1_prelim stays status: planned — its note now says it flips to active when phase 4 launches and the local folder exists.

dashboard.md / dashboard.html are regenerated by pyauto-brain cortex dashboard --apply, never hand-edited.

Checks, all in the task worktree:

  • python3 scripts/cortex.py check → cortex check: OK
  • pyauto-brain cortex dashboard --check → dashboard.md + dashboard.html are current
  • pyauto-brain cortex checkin --dry-run → 2 projects (inference_programme, subhalo_validation); euclid is gone from the check-in and nothing errors on the moved phase
  • python3 -m pytest tests -q → 122 passed

This needs a human merge. projects.yaml is CODE for scripts/ledger_merge.py, not ledger: python3 scripts/ledger_merge.py classify --base origin/main reports code: 1 of 6 path(s) need a human — projects.yaml, so ledger_merge.yml will not auto-land this.

🤖 Generated with Claude Code

https://claude.ai/code/session_01YAZs3f6AAAZrBB3J7vwWdD

The `euclid` project row is superseded: its local `output/` was cleared on
2026-09-07 (60 GB of May–June DR1 grade_ab runs, still on RAL under
/mnt/ral/jnightin/euclid), and the DR1 prelim science now lives in the
`euclid_dr1_prelim` project that phase 4 births. The row, its remaining
phases and its rulings all stay; only `status:` flips to `dormant`, with the
reason recorded in its `note:`.

Phase 4 (`dr1_prelim_10_lens_science_run.md`) moves from `phases/euclid/` to
`phases/euclid_dr1_prelim/` — `Project:` and the H1 follow the directory, the
phase number stays 4 (the Mind epic euclid-dr1-prep names it phase 4), and a
`## Where to look` bullet records the re-home. Witness, Gates, State, Budget,
Runs and Ruling are untouched. `phases/euclid/resimulate_fitted_lens_simulator.md`
now links the new path.

`euclid_dr1_prelim` stays `status: planned`; its note says it flips to active
when phase 4 launches and the local folder exists.

The two dashboards are regenerated by `pyauto-brain cortex dashboard --apply`.
`cortex.py check`: OK. `dashboard --check`: current. `checkin --dry-run` now
lists 2 projects (inference_programme, subhalo_validation). pytest: 122 passed.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01YAZs3f6AAAZrBB3J7vwWdD
@Jammy2211
Jammy2211 merged commit 2fdaec4 into main Sep 7, 2026
2 checks passed
@Jammy2211
Jammy2211 deleted the feature/euclid-dormant-rehome-phase4 branch September 7, 2026 15:51
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant