Skip to content

ci: Run the compatibility matrix against merged SDKs' main branches - #8

Merged
khvn26 merged 1 commit into
mainfrom
ci/sdk-main-branches
Oct 21, 2026
Merged

khvn26 merged 1 commit into
mainfrom
ci/sdk-main-branches

Conversation

@Zaimwa9

@Zaimwa9 Zaimwa9 commented Oct 21, 2026

Copy link
Copy Markdown
Contributor

The spec PRs for python, nodejs, java, dotnet, go, ruby, php, rust and elixir have merged, and their feat/sdk-spec branches were deleted. The compatibility matrix still checked those branches out, so every job failed at checkout (for example on #5).

This points those nine SDKs at main, which is each repo's default branch. js-client keeps feat/sdk-spec until Flagsmith/flagsmith-js-client#430 merges.

The spec PRs for the nine SDKs merged and their feat/sdk-spec branches were deleted, so the matrix failed checking them out. js-client keeps feat/sdk-spec until Flagsmith/flagsmith-js-client#430 merges.
@khvn26
khvn26 merged commit b27e9fc into main Oct 21, 2026
10 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants